Much of the construction coming to Pickering belongs to owners who do not build for a living: a manufacturer taking a site in the Innovation Corridor, a supplier to the nuclear station that has outgrown its shop, a landowner in Seaton. Myhal Construction sits beside that owner, holding no construction contract and bidding none of the work.
What we bring is a record of decisions already made. Our founder spent more than twenty years at PCL Constructors and Oxford Properties delivering office, residential, retail and industrial projects, among them the two-level Riverbend Building 5 and the 466,000-square-foot Mississauga Transit Campus. Those are the building types Pickering is adding now.
Construction Project Management in Pickering, ON
Construction project management in Pickering means running the schedule, the cost and the procurement so the owner does not have to. Our project managers come from the delivery side of large industrial, retail and institutional work, and they bring one senior point of contact and a weekly account of where the project stands.
The Pickering work we are set up to manage includes:
- Warehouse, distribution and manufacturing buildings in the Innovation Corridor and the Seaton employment lands along Highway 407
- Head offices, training centres and shops for suppliers to the nuclear industry
- High-rise and mixed-use residential around Pickering GO and the City Centre
- Municipal, recreation and institutional facilities delivered through public tender
- Projects stalled between design and permit that need someone to get them moving
Our Services in Pickering. Every service, one senior team.
Pickering owners usually arrive with one decision to make. Any of these five services can be the whole engagement.
Owner’s representation
Independent, senior representation for Pickering owners on industrial, institutional and residential work, on site as often as the project needs.
Owner’s representation →Construction project management
Schedule, cost, procurement and consultant coordination run for you, with a weekly account of where the project stands and what changed.
Construction project management →Development management
Land, feasibility, approvals and financing for a Seaton or Innovation Corridor site, including the City, Region and TRCA reviews.
Development management →Construction consulting & estimating
Independent estimates and budget checks priced against current Durham trade rates, so a Pickering pro forma survives its first real tender.
Construction consulting & estimating →Preconstruction planning
Budgets, schedules and procurement strategy set before commitments are made.
Preconstruction planning →Construction Problems in Pickering, ON. What to do when the consultants are not talking to each other
The architect is waiting on the engineer, the engineer is waiting on the civil consultant, and the owner is the only person copied on every email. Here is how we handle it.
Find the gap on paper
Set the drawings side by side and list every place the structural, mechanical, civil and architectural sets disagree. Most coordination problems are small once they are written down.
Get one design lead
Somebody has to own the coordinated set, and it is normally the prime consultant. If nobody was hired to coordinate, that explains the silence, and it is a contract fix before it is a personality fix.
Run one meeting and one log
A single weekly coordination meeting with every discipline present, a numbered issues log and a date beside each item. Emails between two consultants stop deciding things that affect the whole building.
Bring in representation
An owner chairing that meeting alone is refereeing a game whose rules they did not write. We take the chair, keep the log honest and hand you a set that will price and permit. Call 647-932-2902 and we will start with the drawings you have.
A clash that costs hundreds of dollars to resolve in the drawings costs thousands to resolve on site.
Pickering, Ontario Construction Project Management
Pickering is about 40 minutes east of our Toronto office on Highway 401, and the next decade of its construction is already visible. Ontario approved the $26.8 billion refurbishment of Pickering Nuclear units 5 to 8 in late 2025. Subject to Canadian Nuclear Safety Commission licensing, execution begins in early 2027 and runs into the mid-2030s, supporting roughly 30,500 jobs.
The industrial land is in Seaton. The City bought the 800-acre Innovation Corridor from the Province and markets it directly. Kubota Canada anchored it in 2022 with a 500,000-square-foot distribution centre and 65,000 square feet of head office on 50 acres. Next door, the $266 million Seaton Recreation Complex and Library moved into detailed design in late 2025 and is headed for tender. To the south, towers of 40 and 45 storeys are under construction at Pickering City Centre.
For an owner, Pickering is a two-tier file. The City’s new development charge by-law took effect July 1, 2025, Durham Region charges its own, and the Seaton lands are charged on their own schedule. Industrial permit applications filed since February 2025 can defer the regional charge for up to five years under Durham’s Industrial DC Deferral Program. Most of the growth lands sit in the Duffins Creek watershed, so the Toronto and Region Conservation Authority is often the approval that sets the schedule.
Work like yours. Delivered at PCL Constructors and Oxford Properties, and the discipline we bring to Pickering.
Riverbend Business Park — Building 5
Canada’s first large-scale multi-level industrial building — 707,000 SF over two full levels, with heated-ramp trailer access to the upper floor. Fully leased to Amazon. Construction management, 2022.
Mississauga Transit Campus Expansion
A 466,000 SF expansion of Mississauga’s transit maintenance and storage campus.
Riverbend Business Park — Building 3
Large-format industrial building within Oxford’s LEED-certified Riverbend Business Park. Lump-sum delivery, 2020.

Kyle Parry. Directly, on every engagement.
Kyle founded Myhal after more than twenty years leading construction for PCL Constructors and Oxford Properties, with over $3 billion delivered across office, residential, retail and industrial projects in Ontario, Quebec, Alberta and British Columbia.
Owners in Pickering work with Kyle, not with an account team. More about Myhal.
Questions owners ask us about building in Pickering.
Have you delivered a project in Pickering?
Not yet, and we will not pretend otherwise. Our record was built at PCL Constructors and Oxford Properties on the same industrial, municipal and residential building types Pickering is adding, and that is what we bring here.
What does an owner’s representative cost on a Pickering industrial building?
A modest percentage of construction value or a fixed monthly fee, scaled to the job and how much of it you want us to carry. Call 647-932-2902 and we will give you a real number after a first look.
Can you help with the Seaton and Innovation Corridor approvals?
Yes. We manage the consultants who prepare the submissions and keep the City, Regional and TRCA reviews tied to your budget and schedule.
Do you cover Ajax, Whitby and the rest of Durham?
Yes. We serve all of Durham Region from the same office, along with Markham and Scarborough on the way east. See where we work.